The Shed got delivered today. Rob waited up there by himself for pretty much the whole day.
Then the shipping container guy dropped off this. The shed is set back sixty feet from the road. The container is another twenty.
It's barebones in the Shabin right now.
Here is one of the lofts. Initially, the salesman said they would be two ten foot sections but they're actually more like twelve and fifteen feet.
It's going to be a lot of work getting them ready for more than a nights stay. We need to build stairs, insulate and figure out cooling and heating.
Here they are together waiting for us.
We're hoping we're going up either this weekend or next at the latest. We have to have the materials ready and a solid plan of attack so we're not stuck at bedtime with no way to get up to the loft or inadequate bathrooms. But until then, Good bye for now.
P.S. Rob did some recon in the forest and pond areas and came back with some killer photos. I'll be getting those up later this week.
Hi Crystal.
ReplyDeleteI'm way late with this comment, but I just found your blog.
How much, if you don't mind my asking, was the shed?